Client Project  Scope of Work

Saudi ARAMCO

Juaymah Tank Farm and Rastanura Terminal North Tank Farm

Supply, installation, testing and commissioning of Radar Tank Gauging  System.  It consists of few largest tanks in the world.

Saudi ARAMCO

Safaniyah TP-19 Project

Supply, installation and commissioning of DC Batteries and Chargers.  The specialty is that the equipments are of indoor and outdoor nature with IP66 class and in stainless steel to avoid any corrosion from off shore environment. Batteries too in metallic cubicle made of fiberglass reinforced materials equipped with breather and drain facility.

King Khalid University

Abha-New Campus Building

Supply, supervision of installation, testing and commissioning of  48 Nos. of closed coil Cooling Tower from SPX Cooling Technologies – Marley, USA .

Bakri Tank Terminal

 Tank Terminal Project

Supply, installation, testing and commissioning of Thermic Fluid Heater.  This TFH will be used to heat the HFO stored in the tanks in order maintain viscosity.

Saudi Aramco

Uthmaniyah Gas Plant

The Scope is to replace the existing Marley Wooden Cross flow cooling Towers with Pultruded FRP counter flow Cooling Towers. The cooling towers will be replaced in phased manner and will be commissioned in April 2008. The new towers are designed and manufactured in SPX Cooling Technologies GmbH Germany .
SSL-Sharq Sharq Expansion Project SHARQ Project cooling tower has a capacity to cool 161,000 m³/hr and this is a circular cooling tower with base diameter of 113 m and tower height of 71.5 m. This tower will be the largest in Saudi Arabia and one of the world’s largest sea water Round Force draft cooling tower. 
SSL-Sharq Replacement of existing Chillers The brief scope of the project is: replacement of existing Mitsubishi Chillers with Thermax Chillers on-line.  Also it involves dismantling of the existing Chiller network, installation of Chillers, reconnecting/modification of pipes and controls, laying of new control and power cables in the running plant, connection of Chillers on-site (500-600mtrs) to the control room, installing new PLC and modification of the existing DCS and logics online.  The design portion of this project is being done by DAR Industrial Division.
  |  